INDUSTRIES — MANUFACTURING

Cross-site CI, on one operating layer.

Process and discrete manufacturers running networks of plants need an improvement system that propagates between sites — not eight tools per plant that don't talk to each other.

What's broken today

01

Every plant runs its own version.

What works at Plant A is rebuilt at Plant B from scratch.

02

Network-level reporting is a weekly assembly job.

The OE Director's deck is rebuilt every Friday from emails and spreadsheets.

03

Capability and skills walk out the door.

When a CI lead leaves, the institutional memory of why projects worked goes with them.

04

Maturity benchmarking is a quarterly slide, not an action engine.

Annual maturity reviews don't drive next-quarter activity.

Where OpX OS already runs

OpX OS already runs across defence, FMCG and discrete manufacturing networks.

Rheinmetall DefenceRheinmetall Defence
Innocent DrinksInnocent Drinks
AGASAGAS
Hotwire CommunicationsHotwire Communications
Omran OmanOmran Oman
VeygoVeygo
Admiral PioneerAdmiral Pioneer
Rheinmetall DefenceRheinmetall Defence
Innocent DrinksInnocent Drinks
AGASAGAS
Hotwire CommunicationsHotwire Communications
Omran OmanOmran Oman
VeygoVeygo
Admiral PioneerAdmiral Pioneer

Customer quote — placeholder

Quote slot — to be populated by Leon. Suggested tag: 'OE Director, multi-plant manufacturer'.

Modules that matter most here

01

Project Execution Hub

Five method workspaces (DMAIC, A3, Kaizen, JDI, custom) on one operating layer. Stage-gates and approvals built in.

02

Performance Dashboards

Plant-by-plant roll-up to network. Attribution back to the originating project. Export to Power BI, Tableau, Snowflake.

03

Maturity Assessments

LCS-aligned scoring. Benchmark plants against each other, set targets, track trajectory quarter over quarter.

04

Capability Footprint

Skills, certifications, OE belt level — updated by activity, visible by plant and shift. Integrates with Foundations.

Compliance & standards frame

  • AWS eu-west-2 (UK data residency, London)
  • ISO 9001 / 14001 / 45001 / 22000 audit-friendly trail
  • LCS-accredited capability tracking via OpX Foundations
  • Tenant-level AI controls; no model training

What a 12-plant network on OpX OS looks like.

84%reduction in time assembling the standard reporting pack
3.2×more improvement ideas captured per site or team
£140kaverage identified savings per CI lead per year

Indicative figures based on early customer engagements; results vary by organisation size and improvement maturity.

PRICING

However your sector buys — start small, scale on evidence.

Self-serve for small CI teams. 90-day pilot for enterprise. Both ladder onto the same Founding Cohort pricing.

SINGLE-PLANT PILOT

£5,000 fixed

Run a 90-day pilot on one plant. Full network rollout in 18 months. Creditable to Year 1.

Run a 90-day pilot

NETWORK ROLLOUT

Founding Cohort pricing

Past the pilot, scale on Founding Cohort volume-tier pricing. Frontline access included at no per-seat charge.

See full pricing

FAQs

OpX OS dashboard on a laptop

Start where you are. Scale on evidence.

Three products. One capability footprint.

The platform

OS

The operating system for improvement work. Six faces, one operating office.

Explore OS →

The integration layer

Connect

Open API, native connectors, signed webhooks. OS plugs into what you already run.

Explore Connect →

Services & human delivery

Campus

Onboarding, cohorts, partner content, enablement. The human layer around OS.

Explore Campus →

The accredited curriculum

Academy

LCS-accredited learning with Cardiff University. Now native to OS as Foundations.

Explore Academy →